Group Current Projects

Company Project Name Client Date Status
Water/Wastewater Division Projek Penggantian Paip Air Dasar Laut ke Pulau Ketam. JBA, KeTTHA 28th January 2013

Documentations
Water/Wastewater Division Menaiktaraf Loji Rawatan Air Sungai Dara, Tanjung Malim, Perak Darul Ridzuan. Lembaga Air Perak 23rd January 2013 Design in Progress
Water/Wastewater Division Consultancy Services for the Proposed "Program Mitigasi Kekurangan Bekalan Air di Selangor, Wilayah Persekutuan Kuala Lumpur dan Putrajaya 2012/2014. Package 2: Hulu Selangor & Klang. SYABAS 24th October 2012 Design in Progress
Water/Wastewater Division Cadangan Kajian Sistem Agihan Bekalan Air Daerah Kuala Terengganu dan Marang, Terengganu. Syarikat Air Terengganu (SATU) 1st July 2012 Study in Progress
Water/Wastewater Division Consultancy Services for the Proposed Pressure Improvement of Low Pressure Areas in Klang, Petaling, Gombak & Sepang Districts. SYABAS 7th May 2012 Design in Progress
Water/Wastewater Division Menaiktaraf Sistem Bekalan Air di seluruh FELDA Negeri Pahang Zon 2, Bentong, Raub & Kuala Lipis. FELDA 1st February 2012 In Progress
Water/Wastewater Division Engineering Consultancy Services for the Proposed Buluh Kasap New Water Treatment Plant, Johor. Pengurusan Aset Air Berhad (PAAB) 3rd September 2011 Design in Progress
Water/Wastewater Division Consultancy Services for Program Mitigasi Kekurangan Bekalan Air di Selangor, Wilayah Persekutuan Kuala Lumpur dan Putrajaya. Program Penggantian Paip Lama Tahun 2011/2012. Package: P4 (Gombak & Hulu Langat District). SYABAS 1st June 2011 Construction in Progress
Water/Wastewater Division Engineering Consultancy Services for the Proposed Pipe Replacement Programme FY 2010 in Negeri Sembilan for Pengurusan Aset Air Berhad (PAAB). Pengurusan Aset Air Berhad (PAAB) 16th May 2011 Construction in Progress
Water/Wastewater Division Projek Bekalan Air Kuantan Fasa III, Pahang Darul Makmur. Pengurusan Air Pahang Berhad (PAIP) 30th May 2011
Pakej 1 - Membina, Menyiapkan Dan Mentauliah 2.5 Juta Liter Tangki Air Menara Konkrit Bertetulang Serta Kerja-Kerja Berkaitan Di Merabang Tunggal, Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 2 - Membina, Menyiapkan Dan Mentauliah 2.5 Juta Liter Tangki Air Menara Konkrit Bertetulang Serta Kerja-Kerja Berkaitan Di Cherating, Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 3 - Membekal, Memasang, Menguji dan Mentauliah 500mm dia. Paip Keluli Lembut Dari Tangki Ubai Ke Charok Paloh Serta Kerja-Kerja Berkaitan Di Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 4 - Membekal, Memasang, Menguji dan Mentauliah Paip Air 900mm dia. dan 800mm dia. Jenis Keluli Lembut Dari Loji Air Semambu Ke Alor Akar Serta Kerja-Kerja Berkaitan Di Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 5 - Membekal, Memasang dan Mentauliah 500mm dia. Paip Keluli Lembut Dari Tangki Simpang Sg. Soi Ke Tangki Ubai Serta Kerja-Kerja Berkaitan Di Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 6 - Membekal, Memasang, Menguji dan Mentauliah Paip Air 800mm dia. Jenis Keluli Lembut Dari Pekan Gambang Ke Tangki Sedutan Gambang 3 Serta Kerja-Kerja Berkaitan Di Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 7 - Membina, Menyiap Dan Mentauliah Sebuah Tangki Sedutan (1.25 Juta Liter) Dan Rumah Pam Penggalak Gambang 3 Serta Kerja-Kerja Berkaitan Di Gambang, Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 8 - Membina, Menyiapkan Dan Mentauliah 9.0 Juta Liter Tangki Air Imbangan Konkrit Bertetulang Di Gambang 3 Dan Pemasangan Paip Air 450mm dia. Jenis Keluli Lembut Ke Rumah Pam Penggalak Gambang 3 Serta Kerja-Kerja Berkaitan Di Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 9 - Membekal, Memasang, Menguji dan Mentauliah Paip Air 450mm dia. Jenis Keluli Lembut Dari Tangki Imbangan Gambang 3 Ke Tangki Sedutan Loji Air Paya Bungor Serta Kerja-Kerja Berkaitan Di Kuantan, Pahang Darul Makmur. Construction in Progress
Pakej 10 - Membina, Menyiap Dan Mentauliah Sebuah Tangki Air Imbangan (9.0 Juta Liter) Di Pulau Manis, Kuantan, Pahang Darul Makmur. Tender Stage
Pakej 11 - Memasang, Menguji dan Mentauliah Paip Air 250mm dia. Di Pekan Panching Bagi Menggantikan Paip Sedia Ada Serta Kerja-Kerja Berkaitan Tender Stage
Pakej 12 - Memasang, Menguji dan Mentauliah Paip Air 400mm dia. Dari Tangki Panching Selatan Ke Tangki Panching Utara Serta Kerja-Kerja Berkaitan Review
Pakej 13 - Membaikpulih, Menaiktaraf, Menguji dan Mentauliah Stesen Pam Penggalak Taman Tas Serta Kerja-Kerja Berkaitan Review
Pakej 14 - Membaikpulih, Menaiktaraf, Menguji dan Mentauliah Stesen Pam Penggalak Di KM 20 Serta Kerja-Kerja Berkaitan Review
Pakej 15 - Membina, Memasang Dan Mentauliah Penyokong Bagi Lintasan Paip Di Sg. Penur, Kuantan, Pahang Darul Makmur. Completed
Water/Wastewater Division SYABAS ICE: Water Distribution, Non-Revenue
and Asset Replacement Works Financed by
Subscription for Redeemable
Cumulative Preference Shares.
Syarikat Bekalan Air Selangor Sdn Bhd 6th August 2007 Construction
in Progress
Water/Wastewater Division Detailed Design and Supervision for the Construction and Completion of R2 & R8
Elevated Water Storage Tanks, Pipeline and
All Associated Works in Kuantan Port City,
Pahang Darul Makmur.
ECER 11th February 2010 Design Completed
Water/Wastewater Division Detailed Design and Supervision for the Construction & Completion of Pancing
Water Treatment Works, Kuantan Pahang for
The East Coast Economic Region (ECER) Development.

Package 1:
Headworks, Water Treatment Works, Anciliary Buildings, staff Quarters & Associated Works.

Package 2:
Balancing Reservoir, Access Roads & Treated Water Mains.

ECERDC 24th August 2009 Construction Stage
Flood Mitigation/Drainage & Irrigation Division Penyediaan Peta Hazard Banjir bagi Lembangan Sungai Pahang, Pahang. Jabatan Pengairan & Saliran 1st June 2012 Inception Report
Flood Mitigation/Drainage & Irrigation Division Kerja-Kerja Pembinaan Kolam Takungan Banjir serta kerja-kerja lain yang berkaitan di kawasan Perindustrian Bukit Raja Daerah Klang, Selangor Darul Ehsan. JPS 1st February 2012 Construction in Progress
Flood Mitigation/Drainage & Irrigation Division Project Pembinaan Empangan Kahang di daerah Kluang, Johor. Kementerian Tenaga, Teknologi Hijau & Air Malaysia (KETTHA) 15th December 2011 Feasibility Study
Flood Mitigation/Drainage & Irrigation Division Consultancy Services for Detailed Design, Environmental Impact Study and Construction Supervision of Jeniang Transfer Scheme and Naok Reservoir (Dam), Kedah. Ministry of Agricultural & Agro Base Industry (MOA) 25th August 2008 Detailed Design
Highway/Bridges, Dam and Infrastructure Division Feasibility Study, Detail Design and Construction Supervision for Kahang Dam, Kluang Johor Ministry of Energy,Green Technology and Water 31st January 2012 Detail Design Stage
Highway/Bridges, Dam and Infrastructure Division Feasibility Study and Detail Engineering Design For Route Alignment for Upgrading the Safety and Reliability of the Existing Beafort to Tenom Railway Track Ministry of Transportation 5th January 2012 Ongoing
Highway/Bridges, Dam and Infrastructure Division Detailed Design, Environmental Impact Study and Construction Supervision of Jeniang Transfer Scheme and Naok Dam and Reservoir, Kedah Ministry of Agricultural & Agro Base Industry (MOA) 25th August 2008 Tender
Highway/Bridges, Dam and Infrastructure Division Design and Construction Supervision for the Proposed Completion of Road Network in Segambut Area - Link 1 and Link 2 Kuala Lumpur City Hall 25th May 2002 Tender
Building/Structures and Geotechnical Division Proposed Development of Hostel for 10,000 Students for University of Technology Mara Through Private Funding Initiative. Segi Maju Sdn. Bhd. 11th May 2011 Construction In Progress
Building/Structures and Geotechnical Division Proposed Construction of 50 Unit 2 Storey Link Houses in Precint 10 Seksyen U13, Shah Alam Selangor Selangor State Development Corporation 15th August 2012 Design Stage
Building/Structures and Geotechnical Division Proposed Construction and Completion of Industrial Buiding System Project for SK Ukay Sg Sering, Gombak Selangor. Ministry of Education 30th January 2012 Design Stage